Lost Cabin Gas Plant, we designed and built three gas processing trains for ConocoPhillips – $400-million Lost Cabin Gas Plant at Lysite WY. Responsibilities included all aspects of engineering and construction for the grassroots facility, from conceptual design through commissioning.
ConocoPhillips
![](https://americanmk.com/wp-content/uploads/2015/07/conoco_phillips.jpg)